ANALYSIS OF SBR PLANT OPERATION BY CHANGING THE REACTION TIME
DOI:
https://doi.org/10.24867/17CG02MilicKeywords:
wastewater, wastewater treatment plant, SBRAbstract
The main objective of this paper includes the calculation and dimensioning of the biological wastewater treatment plant with activated sludge using the SBR system for the case of continuous and discontinuous water inflow. The aim is to show how important the time parameter of the entire cycle is, as well as duration of individual phases, for the treatment process in terms of load, reactor and pre-tank dimensions, pump and decanter capacity, required amount of oxygen, mass of sludge to be removed and other operating parameters.
References
[1] ATV DVWK A 131 – Nemački standard za dimenzionisanje postrojenja za biološko prečišćavanje otpadnih voda aktivnim muljem
[2] DWA - M 210 – Pravilnik Nemačkog udruženja za vodoprivredu, otpadne vode i otpad za dimenzionisanje sekvencijalnog šaržnog reaktora
[3] Glavni projekat postrojenja za prečišćavanje otpadnih voda (PPOV) sa odvodom prečišćene vode u recipijent u naselju Kovilj
[4] Skripta iz predmeta Tretman voda, Fakultet tehničkih nauka u Novom Sadu, Matija Stipić, 2021,g.
[2] DWA - M 210 – Pravilnik Nemačkog udruženja za vodoprivredu, otpadne vode i otpad za dimenzionisanje sekvencijalnog šaržnog reaktora
[3] Glavni projekat postrojenja za prečišćavanje otpadnih voda (PPOV) sa odvodom prečišćene vode u recipijent u naselju Kovilj
[4] Skripta iz predmeta Tretman voda, Fakultet tehničkih nauka u Novom Sadu, Matija Stipić, 2021,g.
Downloads
Published
2022-05-04
Issue
Section
Civil Engineering