GEODETIC SURVEY PROJECT AND MAKING OF THE AS BUILD STATE PROJECT OF BRIDGE OVER SAVA IN OSTRUŽNICA

Authors

  • Абел Леваи Autor

DOI:

https://doi.org/10.24867/16KG02Levai

Keywords:

geodetic micro-network, mathematic model of data processing, project of geodetic survey, project of as build state

Abstract

This paper describes the methodology of geodetic survey during bridge construction, which includes the phases of designing and implementation of geodetic micronetworks and also the calculation of the accuracy of geodetic survey of the characteristic points of the structure. In the experimental part the example of the Bridge over Sava in Ostružnica is processed.

References

[1] S. Ašanin, Inženjerska geodezija 1, Beograd: Ageo d.o.o., 2003.
[2] Z. Sušić, Projektovanje geodetskih mreža u inženjerskim radovima (materijali sa predavanja), Novi Sad, 2016/17.
[3] Toša Ninkov; Zoran Sušić, Primena inženjerske geodezije u različitim fazama projektovanja i realizacije inženjerskih projekata (Materijali sa predavanja), Novi Sad.
[4] Krunislav Mihailović; Ivan R. Aleksić, Koncepti mreža u geodetskom premeru, Beograd: Geokarta, 2008.
[5] T. Oshima, „Modern survey oflarge bridge and tunnel project for their construction control“.
[6] Y. Fujino, M. Murata, S. Okano и M. Takeguchi, „Monitoring system of the Akashi Kaikyo Bridge and displacement measurement using GPS,“ у SPIE's 5th Annual International Symposium on Nondestructive Evaluation and Health Monitoring of Aging Infrastructure, Newport Beach, CA, United States, 2000.
[7] M. Marchetti; R. Boudon; J. Monnerie; P. Bouve; D. Dupuis; F. Dadoun; G. Baechler; J.Olsfors, „Adjustment of the Rion-Antirion Cable-Stayed Bridge,“ FIG International Symposium on Engineering Surveys for Construction Works and Structural Engineering, 2004.
[8] Toša Ninkov; Dragan Vidaković, „Projekat geodetskog obeležavanja Most preko Save u km.576+023.17 leve trake autoputa E70/E75,“ GeoGIS Konsultanti , Beograd, 2017.

Published

2022-03-05