Skip to main navigation menu Skip to main content Skip to site footer

Environment and Occupational Safety Engineering

Vol. 39 No. 08 (2024): Proceedings of Faculty of Technical Sciences

APPLICATION OF METHODS AND OIRA TOOL FOR RISK ASSESSMENT IN OCCUPATIONAL SAFETY AND HEALTH ON THE EXAMPLE OF NEUROPSYCHIATRIC INSTITUTION NEUROPRAXIS

DOI:
https://doi.org/10.24867/27HZ04Miljanovic
Submitted
October 21, 2023
Published
2024-08-04

Abstract

The paper addresses risk assessment at the workplaces of neurologists and psychiatrists in the neuropsychiatric institution NEUROPRAXIS. Various risk assessment methods were used, including the 5x5 matrix, the KINNEY method, and the OIRA tool. The results revealed a high level of risk associated with hazards such as work-related stress and working with patients.

References

Ћапан, М. (2014). Унапређење модела за процену ризика на радном месту применом теорије фазискупова. Крагујевац: Универзитет у Крагујевцу, Факултет инжењерских наука.
[2] Закон о безбедности и здрављу на раду („Сл. гласник РС“ бр. 35/2023).
[3] Тепић, Г. (2019). Развој методолошког концепта за управљање ризиком у систему опасних материја. Нови Сад: Факултет техничких наука.
[4] Мученски, В. Љ. (2018). Теоријске основе безбедности и здравља на раду у грађевинарству. Нови Сад: Факултет техничких наука.
[5] Гемовић, Б. (2011). Управљање ризицима као елемент интегрисаног Система менаџмента предузећа. Нови Сад: Факултет техничких наука, Универзитет у Новом Саду.
[6] Aven, T. (2011). Quantitative risk assessment Тhe Scientific Platfrom. Norway: University of Stavanger.
[7] European Agency for Safety and Health at Work. (n.d.). Online interactive Risk assessment. Retrieved from https://oiraproject.eu/en/what-oira
[8] IOSH 5x5 Risk Matrix: The Complete Guide. (2023, Maj 26). Retrieved from Theknowledgeacademy: https://www.theknowledgeacademy.com/blog/iosh-5x5-risk-matrix/
[9] Ивановић, М. (2021). Metoda 5x5. Retrieved from Scribd.