OPTIMIZATION OF TRANSFORMER AND FEEDER CABLE SELECTION FOR SUPPLYING THE NEW MAIN PUMP STATION 1 IN NOVI SAD
DOI:
https://doi.org/10.24867/29BE12CulicKeywords:
Selection of power transformers, selection of conductors and protection on the low-voltage side of the transformer, Reactive power compensationAbstract
This paper addresses the selection of transformers and the distribution of loads among transformers for powering pumps at a pumping station in Novi Sad. On the low-voltage side of the transformers, the selection and sizing of supply cables were performed, along with calculations for overload protection and voltage drop. Batteries for reactive power compensation of the pumps were selected. Additionally, the paper covers the determination of the lightning protection level of the installation.
References
[1] Војводинапројект, званични сајт.
https://www.vojvodinaprojekt.rs
[2] Јован Нахман, Разводна постројења, Електротехнички факултет Београд 2005.
[3] Пројекат хидротехничких инсталација Нове главне црпне станице 1 у Новом Саду,
[4] Пројекат електроенергетских инсталација Нове главне црпне станице 1 у Новом Саду
https://www.vojvodinaprojekt.rs
[2] Јован Нахман, Разводна постројења, Електротехнички факултет Београд 2005.
[3] Пројекат хидротехничких инсталација Нове главне црпне станице 1 у Новом Саду,
[4] Пројекат електроенергетских инсталација Нове главне црпне станице 1 у Новом Саду
Downloads
Published
2024-11-02
Issue
Section
Electrotechnical and Computer Engineering