DESIGN OF TUNNEL BUILDING CONDITIONS

Authors

  • Boško Maksić Autor

DOI:

https://doi.org/10.24867/05CG03Maksic

Keywords:

Tunnels, primary construction, secondary construction, geomechanic

Abstract

The paper analyzes the activities required in the construction phase of the tunnel, all from the point of view of the need to adapt the design solutions of the tunnel to the actual geotechnical conditions in the field.

References

[1] M. Vasić-“Geotehničko klasifikovanje stenskih masa za podzemne objekte”, monografija, FTN.
[2] I. Vrkljan –“Podzemne građevine i tuneli”, Građevinski fakultet, Rijeka.

Published

2019-12-05