HYDRAULIC ANALYSIS OF THE WATER BALANCE IN RTB

Authors

  • Nikola Damnjanović Autor
  • Matija Stipić Autor

DOI:

https://doi.org/10.24867/04CG09Damnjanovic

Keywords:

Industrial water, mining waters, water balance

Abstract

This written work contains a description of the system for the suplly of industrial water RTB company from Bor. Also, the work include mining waters thet are being drained from surfase mining and cave mines. The water balance for 2017 is also shown.

References

Studija opravdanosti izgradnje hidrotransporta rude i sistema vodosnabdevanja tehnološkom i tehničkom vodom za kapacitet prerade rude od 5,5 Mt/god. u rudniku bakra Ceroovo; Konzorcijum Rudarsko-geološki fakultet Beograd, GRF Beograd i preduzeće „IWA Consalt doo“, Beograd 2012
[2] Glavni mašinski projekat PS sveže vode za potrebe rudnika bakra „Veliki Krivelj“; Rudarski institut Beograd, Beograd 1981
[3] Nadvišenje flotacijskog jalovišta H – Glavni mašinski i hidrograđevinski projekat; Institut za bakar Bor, 1991
[4] Tehnički rudarski projekat nadvišenja polja 1 flotacijskog jalovišta Veliki Krivelj do kote 390 mnv; Institut za rudarstvo i metalurgiju, Bor, 2016
[5] Tehnološki projekat cementacije kod servisnog okna; Institut za bakar Bor

Published

2019-09-25