ANALYSIS OF ESTIMATED AND REAL COSTS ON THE GENERAL SANITATION AND UPDATING BUILDING

Authors

  • Petar Lukajić Autor

DOI:

https://doi.org/10.24867/07CG04Lukajic

Keywords:

Analysis, Expenditures, Calculation

Abstract

The paper describes and recalculates the positions of construction site construction, rough works, final works, as well as installation and electrical works, with the aim of pointing out, on the basis of completed works, all possible mistakes that were made in the price calculation, and to emphasize sensitive positions for calculation.

References

[1] Ivković B., Popović Ž. (2005), „Upravljanje projektima u građevinarstvu“, Beograd
[2] Kolaković, M. (2010) Analiza troškova, [Internet] raspoloţivo na: http://web.efzg.hr/dok/pds/Strat_pod/-7.%20ANALIZA%20TRO%C5%A0KOVA.pdf
[3] Perĉević, H. (2012) Troškovi i klasifikacije troškova, [Internet] raspoloţivo na: http://web.efzg.hr/dok/RAC/hpercevic/poslovno_planiranje/Tro%C5%A1kovi%20i%20kriteriji%20klasifikacije%20tro%C5%A1kova.pdf
[4] Saša Marenjak, Mohamed A. El-Haram, R. Malcolm W. Horner „Procjena ukupnih troškova projekata u visokogradnji“
[5] Neven Martinec, Nevena Hrnjak Ajduković, Stjepan Bezak “Struktura troškova građevinskih radova u visokogradnji“
[6] Kalkulacije u građevinarstvu, Slavko Savić “Struktura troškova građevinskih radova u visokogradnji“

Published

2020-03-19