Skip to main navigation menu Skip to main content Skip to site footer

Civil Engineering

Vol. 35 No. 07 (2020): Proceedings of the Faculty of Technical Sciences

CONSTRUCTION OF CONCRETE GRID BRIDGES WITH ASSEMBLING ELEMENTS OF THE SAME LENGTH AS IN EXPLOITATION

  • Nikola Marković
DOI:
https://doi.org/10.24867/08CG08Markovic
Submitted
June 25, 2020
Published
2020-06-25

Abstract

Purpose of this paper is primarily to justify increasing use of prefabricated beam concrete bridges today from aspect of economy and racionality, their increasing growth of competitiveness on the market and probably suppressing tradicional way of building in the future. With numerous examples we will go through all the methods and technologies of building these bridges. This paper will be based on application of prefabricated elements which are same length as in exploatation. It should be noted that prefabricated elements can be shorter than elements in exploatation, which results in some other methods of building.

References

[1] Montažni građevinski objekti, Ekonomika, Beograd, 1983.
[2] Petrović, M.: Montažne armiranobetonske konstrukcije, Izgradnja, Beograd, 1981.
[3] Priručnik za projektovanje puteva u Republici Srbiji - Nosivi sistemi mostova, Beograd, 2012.
[4] Priručnik za projektovanje puteva u Republici Srbiji - Rasponske konstrukcije mostova, Beograd, 2012.
[5] J. Radic, Mostovi: Dom i svijet, Zagreb 2002.