Skip to main navigation menu Skip to main content Skip to site footer

Civil Engineering

Vol. 35 No. 09 (2020): Proceedings of the Faculty of Technical Sciences

MANAGEMENT OF THE PROCESS OF DESIGNING SWITCH YARDS - TRANSFORMER STATIONS

  • Jelena Sirovljević
DOI:
https://doi.org/10.24867/09CG07Sirovljevic
Submitted
September 1, 2020
Published
2020-09-01

Abstract

The subject of research in this paper is the analysis and importance of managing the process of drafting project documentation for power facilities. The research is focused on early identification, planning and risk control in the initial stages of the project life cycle.

References

[1] M. Milanković, D. Perić, I. Vlajić-Naumovska, “Osnovi elektroenergetike” , Visoka škola elektrotehnike i računarstva strukovnih studija, Beograd, 2016.
[2] Sreten Škuletić, Nikolija Kaljević, “VISOKONAPONSKA RAZVODNA POSTROJENJA”
[3] ZAKON O ENERGETICI (“Sl. Glasnik RS”, br. 145/2012 i 95/2018- dr zakon)
[4] Zakonu o planiranju i izgradnji ("Sl. glasnik RS", br. 72/2009, 81/2009 - ispr., 64/2010 - odluka US, 24/2011, 121/2012, 42/2013 - odluka US, 50/2013 - odluka US, 98/2013 - odluka US, 132/2014, 145/2014, 83/2018, 31/2019, 37/2019-dr. zakon i 9/2020)
[5] Pravilnika o sadržini, načinu i postupku izrade i način vršenja kontrole tehničke dokumentacije prema klasi i nameni objekata ("Službeni glasnik RS", br.73/2019)
[6] Branislav Ivković, Željko Popović, “Upravljanje projektima u građevinarstvu”
[7] Carl Chatfield, Timothy Johnson, “Microsoft Project 2010- Step by step”
[8] Mr Ognjen Radišić, dipl.inž.el., doktorska disertacija “Razvoj modela upravljanja projektom pripreme postrojenja za bušenje nafte i gasa”