DAY AHEAD SCHEDULING PROCESS WITHIN EUROPEAN INTERCONNECTION

Authors

  • Sanja Marinković Autor

DOI:

https://doi.org/10.24867/11BE26Marinkovic

Keywords:

ENTSO-E, scheduling, day ahead schedules, market, auctions, capacity, Verification Platform, report

Abstract

The paper presents an analysis of the functi­oning and development of a system for day ahead trading (ESS – ENTSO-E Scheduling system). In addition to a detailed description of the way of creating and the importance of day ahead schedules, the paper also presents the development of the electricity market, both in Europe and in Serbia. The paper also deals with the way in which auctions for the allocation of cross-border transmission capacities are conducted, the process of creating reports, and the documents that are exchanged on the Verification Platform, in order to successfully complete the Day Ahead process.

References

[1] The 50 Year Succss Story – Evolution of a European Interconnected Grid, Publisher: Secretariat of UCTE (pristupljeno u septembru 2020.)
[2] https://ems.rs/media/uploads/2020/Prezenacije/-01%20Prezentacija%20Alokacije%20i%20Garancije%20porekla%202020.pdf (pristupljeno u septembru 2020.)
[3] Program Novita (pristupljeno u septembru 2020.)
[4] Procedura izrade dnevnog plana rada elektroenergetskog sistema u procesu dan unapred, Jadranka Janjanin, dipl.inž.el., novembar 2015. (pristupljeno u septembru 2020.)
[5] Policy 2: Scheduling and Accounting, RG CE, 2018.