ANALYSIS OF THE PROCUREMENT PROCEDURE FOR FLUE GAS DESULPHURIZATION PLANT

Authors

  • Катарина Адамовић Autor

DOI:

https://doi.org/10.24867/13GI12Adamovic

Keywords:

Nikola Tesla Thermal Power Plant, procedure, public procurement

Abstract

Тhe subject of the paper is procurement procedure analysis for the project titled „Gas desulphurization construction building process – thermal power plant Nikola Tesla, block B. The paper defines the impact and significance of thermal power plant pollution on the environment in Serbia and in the Western Balkans. The effect of the action on the human body due to the inhalation of dangerous particles caused by the combustion of coal is explained. The whole procedure, analysis of the plan, costs and realization of this procurement are presented.

 

References

[1] Љиљана Благојевић, „Животна средина и здравље“, Универзитет у Нишу, 2012.
[2] Уредба о условима за моноторинг и захтевима квалитета ваздуха ("Сл. гласник РС", бр, 11/2010, 75/2010 и 63/2013).
[3-4] Health and Environment Alliance – извештај “Европа без угља” ,Акција ЕУ на Западном Балкану, 2019 година.
[5] Извештај о стању животне средине у ЈП „Електропривреда Србије“ за 2019. годину, Београд, Мај 2020. године
[6] ПД ,,Термоелектране Никола Тесла’’ д.о.о. Обреновац, Александра Стојановић, фебруар, 2013 године.
[7] Александар Јововић, Драгослава Стојиљковић „Одсумпоравање димних гасова у термоелектранама на лигнитни угаљ“, септембар 2012. године.

Published

2021-08-01

Issue

Section

Industrial Engineering and Management