CONSTRUCTION OF THE MAIN-MAGISTRAL CHANNEL OROM-ČIK-KRIVAJA SUBSYSTEM TISA-PALIĆ, REPUBLIC OF SERBIA

Authors

  • Branka Kurćubić Autor
  • Vladimir Mučenski Autor

DOI:

https://doi.org/10.24867/01CG04Kurcubic

Keywords:

construction technology, Orom-Čik-Krivaja channel

Abstract

The subject of work is planning and organizing perform of channel profile on II section of magistral channel Orom-Čik-Krivaja from the km 9+450 to km 24+450. This implies planning the process of technologies of the excavation and the profile of the embankment, the selection of the appropriate anti-filtration coating, as well as the selection of the appropriate mechanization.

 

References

[1] Studija opravdanosti i studije uticaja na životnu sredinu magistralnog kanala Orom-Čik-Krivaja (deonica II) podsistema Tisa-Palić.
[2] Mehanizacija u građevinarstvu, Ratko S. Ćulibrk, Momir M. Plavšić, Univerzitet u Novom Sadu, Građevinski fakultet u Subotici, 2007. godine.
[3] Tehnologija i organizacija građenja, Milan Trivunić, Zoran Matijević, FTN izdavaštvo, Novi Sad, 2009. godine.

Published

2018-12-21