PLANNING OF THE PRODUCTION OF STRUCTURAL ELEMENTS OF THE PREFABRICATED HALL
DOI:
https://doi.org/10.24867/16CG02BozicKeywords:
planning, resources, prefabricated hall, variants, work brigadesAbstract
The paper plans the production of prefabricated hall construction elements. When considering possible solutions for production planning, the number of work brigades was varied, and the criteria on the basis of which the most favorable solution was chosen are based on the duration of the production cycle and the rational use of resources.
References
[1] Opricović S.: "Optimizacija sistema", Građevinski fakultet Univerziteta u Beogradu, Beograd, 1992.
[2] Interne građevinske norme preduzeća Novotehna, Novi Sad.
[3] Božić J.: "Analiza resursa za proizvodnju elemenata konstrukcije montažne hale u Kuli", Diplomski (bachelor) rad, FTN Novi Sad, 2020.
[2] Interne građevinske norme preduzeća Novotehna, Novi Sad.
[3] Božić J.: "Analiza resursa za proizvodnju elemenata konstrukcije montažne hale u Kuli", Diplomski (bachelor) rad, FTN Novi Sad, 2020.
Downloads
Published
2022-01-04
Issue
Section
Civil Engineering