Skip to main navigation menu Skip to main content Skip to site footer

Mechanical Engineering

Vol. 37 No. 04 (2022): Proceedings of the Faculty of Technical Sciences

APLICATION OF LEAN AND BIM METHODOLOGY IN PROJECT DESIGN

  • Мирко Мијатовић
DOI:
https://doi.org/10.24867/17AM12Mijatovic
Submitted
March 30, 2022
Published
2022-03-30

Abstract

BIM methodology is an innovative solution in the approach to project design. It is designed so that everything takes place in one central model, which anyone can access at any time and feel in reality what a future solution will look like. But in order for the BIM methodology to be fully applied in the project development process, it is necessary to coordinate well and organize the processes within it. The Lean philosophy and its useful tools are in charge of this part, which have been applied and proven to be improved in this paper.

References

[1] https://samoobrazovanje.rs/kaizen-metoda/;
[2] Младен Зворц, Lean менаџмент у непроизвољној организацији;
[3] http://project-management-srbija.com/lean-menadzment;
[4] Masaaki Imai: Gemba Kaizen: A Commonsense Low-cost Approach to Management, McGraw-Hill, 1997;
[5] Krunoslav Horvat, SIX SIGMA strategija. https://zir.nsk.hr/islandora/object/vuka:201/preview;
[6] http://www.worksimp.com/articles/process-improvement-articles.shtml;
[7] http://www.cimlss.rs/sipoc-model/;
[8] Eastman, Charles; Fisher, David; Lafue, Gilles; Lividini, Josif; Stoker, Douglas; Iessios, Christos (septembar 1974). Pregled sistema opisa zgrade. Institut za prostorno planiranje, Univerzitet Carnegie-Mellon;
[9] "Autodesk (2002). Modeliranje informacija o zgradama. San Rafael, Kalifornija, Autodesk, Inc";
[10] BIM Manager: Mark Baldwin.