IDENTIFICATION OF RISKS AND THEIR IMPACT ON DYNAMICS AND COSTS

Authors

  • Никола Милекић Autor
  • Владимир Мученски Autor

DOI:

https://doi.org/10.24867/18CG07Milekic

Keywords:

risk, project risk management, risk identification.

Abstract

One of the basic elements of project management is project risk management, taking into account that risks can negatively affect the success of project implementation by not being realized in a given time frame, with a certain quality or in the planned budget. Uncertainty of any kind related to the realization of the set goals can be called project risk. The only way to get acquainted with the characteristics of the project lies in a systematic approach, analysis through which it is possible to see both the components of the project and their interrelationships. Project management techniques are nothing more than an attempt to reduce the uncertainty of events in order to dose the set goals.

References

[1] Project Management Body of Knowledge
[2] Wideman, R. Max, Project and program risk management: a guide to managing project risks and opportunities, Project Management Institute, Newtown Square, Pennsylvania, 1992
[3] Вујић, Д., Менаџмент људских ресурска и квалитет, Центар за примењену психологију, Београд, 2003
[4] Новаковић, Б., Менаџмент савремене грађевинске фирме, Центар за организацију, развој и менаџмент, а.д., Београд, 1999
[5] Cooper, D., Grey, S., Raymond, G., Walker, P., Managing Risk in Large Projects and Complex Procurements, John Wiley and Sons, Ltd, 2005
[6] Управљање ризиком грађевинских пројеката
[7] Главни пројекат реконструкције, модернизације и изградње двоколосечне пруге Београд – Стара Пазова – Нови Сад – Суботица – државна граница. Деоница: Стара Пазова – Нови Сад. Књига 7 Пројекат мостова и пропуста. Пројекат моста на км 67+042
[8] Искуство изградње моста преко двоколосечне пруге на деоници Стара Пазова – Нови Сад.

Published

2022-07-09