Civil Engineering
Vol. 37 No. 07 (2022): Proceedings of Faculty of Technical Sciences
METHOD STATEMENT FOR CONSTRUCTING UNDERGROUND CONSTRUCTION AND CRANE INSTALLATION FOR THE FACILITY OF THE PALACE OF JUSTICE OF SERBIA IN NOVI SAD
Abstract
The aim of this paper is to present the Method statement for the construction of an underground structure and the installation of a crane. As already mentioned, the facility has been contracted according to Fidic, and in the presentation of the Method statement, a very clearer picture of the facility itself will be created, as well as the way in which the works will be performed.
References
[1] Babic, I. (2008). Uvod u građansko pravo i stvarno pravo. Beograd: Projuris.
[4] Nikcevic, I., & Nikcevic, J. (2011) Ustupanje izvođenja radova kod ugovora o građenju. Singidunum revija, 8 (1), str. 265-276.
[6] Popovcic Avric, S., & Đenic, M. (2011). Strane direktne investicije kao dinamički faktor svetske privrede. Singidunum revija, 8(1), str. 197-206.
[7] Službeni glasnik RS. (2011). Zakon o planiranju i izgradnji. Službeni glasnik RS br. 72/09, 81/09 - ispr., 64/10 odluka US i 24/11
[8] Službeni list SFRJ. (1989). Zakon o obligacionim odnosima, Službeni list SFRJ, br. 29/78, 39/85, 45/89 – odluka USJ i 57/89,
[9] Službeni list SRJ, br. 31/93 i Službeni list SCG, br. 1/2003
[10] Unkovic, M., & Kordic, N. (2011). Mogućnosti Srbije za privlačenje stranih direktnih ulaganja. Singidunum revija, 8(1), str. 163-177.
[11] Vukmir, B. (2009). Ugovori o građenju i uslugama savjetodavnih inžinjera. Zagreb: RRiF. YU Build. (2008). Znanje za stvaraoce Preuzeto 29.10.2016. sa http://www. inwestserbia.com/Prilozi/PrezentacijaFIDIC.pdf