Skip to main navigation menu Skip to main content Skip to site footer

Civil Engineering

Vol. 37 No. 09 (2022): Proceedings of Faculty of Technical Sciences

CONSTRUCTION PROJECT MANAGEMENT DEPENDING ON THE TYPE OF CONTRACT

  • Глигорије Вујачић
DOI:
https://doi.org/10.24867/19CG07Vujacic
Submitted
September 8, 2022
Published
2022-09-08

Abstract

This work describes the principle of project management in construction, which includes the initial stages of each project, the role of project participants and contracting projects that are not unique in construction and on which further depends the method of management and, of course, project implementation. The principles of project management contracted per unit of measure as well as those projects contracted with the "turnkey" provision were analyzed, concrete examples of cases were given and a conclusion was drawn.

References

1. Развој идеје и концептуализација пројекта
2. Израда инвестиционог програма и доношење коначне одлуке
3. Дефинисање пројекта и израда пројектне документације
4. Имплементација
5. Испитивање и операционализација пројекта
6. Анализа и затварање пројекта