Skip to main navigation menu Skip to main content Skip to site footer

Civil Engineering

Vol. 37 No. 11 (2022): Proceedings of Faculty of Technical Sciences

DETERMINATION OF THE CONSTRUCTION TIME OF PARTITION WALLS BY MEASURING ON THE CONSTRUCTION SITE

  • Недељка Јовишић
DOI:
https://doi.org/10.24867/20CG10Jovisic
Submitted
November 9, 2022
Published
2022-11-09

Abstract

The technology of interior (partition) walls is defined on a multi-storey business-residential building with AB skeleton construction. Experimentally, using the method of photo-survey and the method of recording (photographs) of the working day, the norm of the time for building the walls was determined. The obtained results, average real norms, (measured for 10 days) were compared with domestic and foreign norms and the differences obtained were explained.

References

(1) Пешко Н. Игор: Технологија извођења грубих грађевинских радова, Униврзитет у Новом Саду, Факултет техничких наука, Нови Сад, Србија, 2021.
(2) Флашар Александар, Вуковић Светлана, Брана Петар: Проучавање технолошких процеса у грађевинарству, Факултет техничких наука у Новом Саду, ООУР Научно-образовни институт за индустријску градњу, Нови Сад, Србија, 1985.
(3) Куриј Казимир: Градитељски пројект менаџмент, Грађевинска књига, Београд, 2005.
(4) Тривунић Милан, Матијевић Зоран: Технологија и организација грађења, Факултет техничких наука Универзитета у Новом Саду, Нови Сад, Србија, 2004.