LESSONS LEARNED FROM THE PRELJINA TOLL STATION EXPANSION PROJECT ON STATE ROAD IA1 E763
DOI:
https://doi.org/10.24867/20CG11LazovicKeywords:
Technology of constructnig, dynamic plan of constructoin, project realization costsAbstract
The goal of the project, which was set before the contractors, is that by expanding the toll station, the same object will be relieved of traffic jams while increasing the flow of vehicles per unit of time, as well as the safety of both road users and people employed at the toll station.
References
[1]. M. Trivunić, Z. Matijević, „Tehnologija i organizacija građenja“, Fakultet tehničkih nauka, Novi Sad, 2004.
[2]. I. Peško, „Tehnologija izvođenja grubih građevinskih radova“, Fakultet tehničkih nauka, Novi Sad, 2016.
[3]. Đ. Uzelac, „Putevi i gradske saobraćajnice“, Fakultet tehničkih nauka, Novi Sad, 2015.
[4]. ŠID PROJEKT doo „Projekat za izvođenje Bočna naplatna stanica u okviru petlje „Preljina“ na državnom putu IA2 E-763, KO Preljina, grad Čačak“, 2019.
[5]. Arhiva „STRABAG DOO BEOGRAD – OGRANAK PUTEVI ČAČAK“ 2019.
[2]. I. Peško, „Tehnologija izvođenja grubih građevinskih radova“, Fakultet tehničkih nauka, Novi Sad, 2016.
[3]. Đ. Uzelac, „Putevi i gradske saobraćajnice“, Fakultet tehničkih nauka, Novi Sad, 2015.
[4]. ŠID PROJEKT doo „Projekat za izvođenje Bočna naplatna stanica u okviru petlje „Preljina“ na državnom putu IA2 E-763, KO Preljina, grad Čačak“, 2019.
[5]. Arhiva „STRABAG DOO BEOGRAD – OGRANAK PUTEVI ČAČAK“ 2019.
Downloads
Published
2022-11-09
Issue
Section
Civil Engineering