Civil Engineering
Vol. 39 No. 02 (2024): Proceedings of the Faculty of Technical Sciences
CONCEPTUAL DESIGN OF THE WASTEWATER SEWAGE FOR THE SETTLEMENT OF ČURUG
Univerzitet u Novom Sadu, Fakultet tehničkih nauka, Departman za građevinarstvo i geodeziju
Abstract
This paper presents a preliminary design for the sewage system for the settlement of Čurug to the wastewater treatment plant. Taking into account the location of the plant, the topography of the terrain (plain area), and following the limitations of minimum slope and digging depth, 12 pumping stations are planned for the proper functioning of the sewage network. The entire collected waste water of the settlement is taken to the waste water treatment plant by the main collector, which is routed along Dr. Lazar Pauč street, where it then goes under treatment before being discharged into Mrtva Tisa. Network modeling and hydraulic calculations were done by using the EPA SWMM software package.
References
[1]http://www.ekourbapv.vojvodina.gov.rs/wp-content/uploads/2018/09/sajt-strategija-vodosnabdevanja-i-zastite-voda-apv.pdf
[2] Regulacioni plan naselja Čurug, (Izmene i dopune UP MZ Čurug) Predlog plana
[3] https://sr.wikipedia.org/srec/%D0%A7%D1%83%D1%80%D1%83%D0%B3
[4] Margeta Jure. Kanalizacija naselja: odvodnja i zbrinjavanje otpadnih i oborinskih voda. Građevinsko-arhitektonski fakultet Sveučilišta u Splitu, 2009.
[5] Marko V. Ivetić. Računska hidraulika Tečenje u cevima. Beograd, 1996.
[6] Pisana predavanja: doc. dr Matija Stipic, Komunalna hidrotehnika, Fakultet tehničkih nauka u Novom Sadu, 2016.