Skip to main navigation menu Skip to main content Skip to site footer

Civil Engineering

Vol. 39 No. 06 (2024): Proceedings of Faculty of Technical Sciences

ECONOMIC ANALYSIS FOR HEAVY MAINTENANCE (ROAD REHABILITATION - UPGRADING) OF THE STATE ROAD IB 22 Section: RAŠKA (K. MITROVICA) - NOVI PAZAR (BANJA) from km 235+917 to km 253+891, L=17,974 km

DOI:
https://doi.org/10.24867/27CG01Glisic
Submitted
October 29, 2023
Published
2024-06-06

Abstract

The paper presents an economic analysis of enhanced maintenance of state road IB 22, performed using the HDM-4 model. This model calculates discounted flows of net benefits (savings) over the analysis period. The economic analysis was carried out for each homogenous section as well as cumulatively for the entire section. The period of exploitation, for which the economic analysis of the rehabilitated road section was carried out, is 10 years, and the total period of analysis includes 13 years.

References

1. „Управљање путном мрежом”, др Небојша Радовић и доц. др Милош Шешлија
2. „Приручнику за анализу трошкова и користи за Србију”, ЈП Путеви Србије, Београд, децембар 2010.
3. „Аpplying the HDM-4 Model to Srategic Planning of Road Works” – Rodrigo Archondo – Callao
4. „Основе за оптимизацију управљања одржавањем коловоза“ – Небојша Радовић, Ђорђе Узелац и др.