Skip to main navigation menu Skip to main content Skip to site footer

Civil Engineering

Vol. 39 No. 02 (2024): Proceedings of the Faculty of Technical Sciences

ANALYSIS OF CO2 EMISSIONS IN THE CONSTRUCTION INDUSTRY USING BIM TECHNOLOGY

  • Stefan Čumić
DOI:
https://doi.org/10.24867/26CG04Cumic
Submitted
February 1, 2024
Published
2024-02-01

Abstract

The subject of this paper is the implemen­tation of BIM (Building Information Modeling) in the analysis of greenhouse gas emissions throughout all phases of the project. All phases, from design to the actual operation of the building, have been analyzed. BIM software was used for the gas analysis, where a model of an existing house was created. All factors in the materialization phase were taken into account, including the production of elements, material transport, and on-site construction.

References

[1] Feng, Y.P.; Yong, W.; Liu, C.B. Energy-efficiency supervision systems for energy management in large public buildings: Necessary choice for china. Energy Policy 2009, 37, 2060–2065.