Skip to main navigation menu Skip to main content Skip to site footer

Civil Engineering

Vol. 39 No. 12 (2024): Proceedings of Faculty of Technical Sciences

PROJEKAT PRETHODNO NAPREGNUTOG ARMIRANOBETONSKOG MOSTA

  • Luka Tanasijević
DOI:
https://doi.org/10.24867/29CG02Tanasijevic
Submitted
June 12, 2024
Published
2025-11-18

Abstract

In this paper a design of post-tensioned reinforced concrete bridge is presented. Bridge is constructed using incremental launching method. Launching and exploitation phase are observed separately. The bridge is continuous beam static system, with deck supported on elastomeric bearings, which are resting on pier heads. Static analysis, design and adopting reinforcement are provided. Since the bridge location site has very high seismic activity, use of seismic isolators is necessary.

References

[1] AASHTO LRFD 8th Edition: Bridge Design Specifications 2017.
[2] CEB-FIP Model Code 1990: Design Code, 1990.
[3] Incremental launching versus scaffolding for construction of prestressed concrete bridges, Chalmers University of Technology, 2005.
[4] AzDTN 2.3-1, “Construction in Seismic Regions”, State of the Republic of Azerbaijan, Baku, 2010.