Skip to main navigation menu Skip to main content Skip to site footer

Civil Engineering

Vol. 34 No. 07 (2019): Proceedings of the Faculty of Technical Sciences

ASSESSMENT АND REPAIR OF RC BRIDGE OVER RIVER LIM IN PRIJEPOLJE

  • Edina Čićić
DOI:
https://doi.org/10.24867/03CG04Cicic
Submitted
June 17, 2019
Published
2019-06-17

Abstract

Main task in this paper is rehabilitation of an old reinforced concrete brigde located in Prijepolje with overview of current condition state of it and with measures for its rehabilitation

References

[1] M. Malešev, V. Radonjanin: Skripta sa predavanja Trajnost i procena stanja betonskih konstrukcija, Fakultet tehničkih nauka, Novi Sad.
[2] М.Pržulj: Mostovi, Izgradnja, Beograd, 2014.
[3] https://eurocodes.jrc.ec.europa.eu/doc/1110_WS_EC2/report/Bridge_Design-Eurocodes-Worked_examples.pdf
[4] https://sh.wikipedia.org/wiki/Most_sv._Irineja
[5] http://www.grf.bg.ac.rs/p/learning/pravilnici_za_optere_enja_mostova_1383809672547.pdf