ASSESSMENT АND REPAIR OF RC BRIDGE OVER RIVER LIM IN PRIJEPOLJE

Authors

  • Edina Čićić Autor

DOI:

https://doi.org/10.24867/03CG04Cicic

Keywords:

bridge rehabilitation, footbridge

Abstract

Main task in this paper is rehabilitation of an old reinforced concrete brigde located in Prijepolje with overview of current condition state of it and with measures for its rehabilitation

References

[1] M. Malešev, V. Radonjanin: Skripta sa predavanja Trajnost i procena stanja betonskih konstrukcija, Fakultet tehničkih nauka, Novi Sad.
[2] М.Pržulj: Mostovi, Izgradnja, Beograd, 2014.
[3] https://eurocodes.jrc.ec.europa.eu/doc/1110_WS_EC2/report/Bridge_Design-Eurocodes-Worked_examples.pdf
[4] https://sh.wikipedia.org/wiki/Most_sv._Irineja
[5] http://www.grf.bg.ac.rs/p/learning/pravilnici_za_optere_enja_mostova_1383809672547.pdf

Published

2019-06-17