Comparative Analysis of Traditional and Hybrid Bridge Abutments Using Multi-Criteria Decision-Making Methods

  • Јована Тепавчевић
DOI:
https://doi.org/10.24867/36CG08Tepavcevic
Submitted
October 14, 2026
Published
2026-10-16

Abstract

This paper presents a comparative analysis of traditional reinforced concrete abutments and hybrid Reinforced Earth bridge abutments using multi-criteria decision-making methods. The analysis was conducted through a case study of a bridge project in Tripoli, considering technical, economic and geotechnical criteria. The results of TOPSIS and Life-Cycle Cost analyses show that the hybrid system provides better overall performance than the traditional solution.

References

  1. [1] Dragan Č. Lukić, Petar V.Anagnosti. Geotehnika saobraćajnica. Beograd : s.n., 2010.
  2. [2] Bonić, Prof. dr Zoran. Potporne konstrukcije. (pristupljeno u julu 2026.) https://project.gaf.ni.ac.rs/ecivil/sites/default/files/2020-03/Potporne%20konstrukcije%201_prof.%20Zoran%20%20Bonic.pdf.
  3. [3] Reinforced Earth Company Ltd. Bridge Abutments. Reinforced Earth Company Ltd., Mississauga, Ontario, Canada. Dostupno u tehničkom priručniku „Bridge Abutments“
  4. [4] AASHTO. LRFD Bridge Design Specifications. American Association of State Highway and Transportation Officials, Washington D.C., USA.
  5. [5] Schlosser, F., Guilloux, A., Long, N.T., Vegaey, J. Reinforced Earth Bridge Abutments. Terre Armée Internationale, Paris, France. Technical Paper No. 5.01, Reinforced Earth Bridge Abutments.