LINKING SHEIKH KHALIFA SPECIALIST HOSPITAL WITH THE FEDERAL ROADS NETWORK – MSE WALLS

Authors

  • Momir Milivojević Autor

DOI:

https://doi.org/10.24867/22CG05Milivojevic

Keywords:

MSE walls, Retaining walls, Project management

Abstract

Doing business in international conditions is a very challenging experience for every engineer that requires special skills, and some of them are knowledge of business customs of the country where the project is carried out, understanding of different standards (British Standard, AASHTO, Eurocode), knowledge of foreign languages and so on. The ultimate goal of every business is a high-quality design flow, efficient implementation of potential revisions and successful implementation of works on the ground.

References

[1] B. Trbojević, "Organizacija Građevinskih Radova", Naučna Knjiga, Beograd, 1992.
[2] B. Ivković, Ž. Popović, "Upravljanje Projektima u Građevinarstvu", Građevinska Knjiga, Beograd, 2005.
[3] FHWA-NHI-00-043, U.S. Department of Transportation, Federal Highway Administration, Mechanically Stabilized Earth Walls And Reinforced Soil Slopes - Design & Construction Guidelines, NHI - National Highway Institute Office of Bridge Technology, 2001.
[4] ''Bridge foundations and substructures'', Department of the Environment, Building Research Establishment, London, 1979.

Published

2023-04-03